Skip to content
Orrsap
DWG-00Product: Monoblock Pump 1HP250 units - due 30 Oct

From order to dispatch, every part accounted for.

Orrsap connects your sales orders, bills of materials, production, inventory, purchase and accounts in one ERP built for Indian manufacturers, and uses AI to warn you about material shortages before they delay an order.

Book a demo
12345SO-3318 - 250 UNITS - DUE 30 OCT
  1. 1

    Motor body

    Casting, CI FG200

    Need
    250
    Stock
    180

    PO-771 arriving 21 Oct

  2. 2

    Impeller

    Brass, 7 vane

    Need
    250
    Stock
    260

    In stock

  3. 3

    Shaft

    EN8, 16 mm

    Need
    250
    Stock
    90

    In production - Lathe 2

  4. 4

    Mechanical seal

    Carbon / ceramic, 16 mm

    Need
    250
    Stock
    40

    Shortage - 210 short

  5. 5

    Fasteners kit

    M8 HT, zinc

    Need
    250
    Stock
    1,200

    In stock

AI Shortage Predictor: seals will run short on 24 Oct and delay SO-3318 by 6 days. Suggested: order 220 seals from Supplier B (lead time 4 days) today.

Drawn by

Orrsap

Checked by

AI Predictor

Approved by

Pending

Status

Shortage

Drawn for these shops

  • Engineering and fabrication
  • Auto components
  • Plastics and packaging
  • Food processing
  • Furniture
  • Textiles
  • Agri-equipment

One order. Six modules. No re-typing.

Follow SO-3318 through the plant. The same record moves from sales to the BOM, the machine schedule, the stores, purchase and the books. Each module reads what the last one wrote.

  1. P-0011

    Sales Orders

    SO-3318

    250 pumps promised for 30 Oct

  2. P-0022

    BOM Builder

    FG-1001 Rev C

    42 parts exploded, 3 levels

  3. P-0033

    Production

    WO-5531

    Assembly booked 23 to 25 Oct

  4. P-003.14

    Inventory

    BO-015

    40 seals in stock, 250 needed

  5. P-0045

    Purchase

    PO-784

    220 seals from Supplier B

  6. P-0056

    Finance

    17.5%

    Margin on the order, after GST

DWG-01Sales OrdersSheet 2 of 8

Quote it, promise it, ship it, bill it.

Quotations, sales orders, dispatch planning, e-way bills and GST invoices, with delivery promises checked against stock and capacity before you commit.

  1. 1

    Delivery promise check

    When an order is entered, Orrsap explodes the BOM, reserves available stock and tests the date against the machine schedule before you confirm it.

  2. 2

    Dispatch planning

    Split orders into lots, plan trucks by weight and volume, print packing lists and dispatch advice for each lot.

  3. 3

    E-way bills and e-invoices

    IRN and QR code are generated from the invoice itself. E-way bills are created with vehicle and transporter details, without re-typing.

Open Sales Orders
Detail
A

Sales / Orders / SO-3318

SO-3318 - Kisan Agro Traders

Quotation QT-1290 convertedStock checkedCapacity checkedPromise: 30 Oct
ItemQtyRateGSTAmount
Monoblock Pump 1HP2506,85018%17,12,500
Monoblock Pump 0.5HP1205,20018%6,24,000
Foot valve 1 inch37031018%1,14,700

Dispatch plan

Lot 1 - 180 units - 24 Oct

Lot 2 - 190 units - 30 Oct

Taxable / GST

24,51,200 + 4,41,216 IGST

Rs 28,92,416

DWG-02BOM BuilderSheet 3 of 8

Every product, broken down to the last bolt.

Multi-level bills of materials with versions, alternates, scrap allowances and costing that rolls up level by level.

  1. 1

    Revisions and release

    Draft, review and release a new revision with an effective date. Older revisions stay on record for traceability.

  2. 2

    Alternate parts

    Define approved alternates with priority, so planning can switch to PT-044B when PT-044 is short, without editing the BOM.

  3. 3

    Rolled-up costing

    Standard and actual cost roll up from the last purchase rate, moving average or a fixed rate, level by level.

Open BOM Builder
Detail
B

Engineering / BOM Builder / FG-1001

BOM - FG-1001 Rev C

Rev C - released 02 SepRev B - archived3 levels - 42 items
PartVersionQty perScrapCost Rs
FG-1001 Monoblock Pump 1HPRev C1 no-4,915
SA-210 Motor assemblyRev B1 no-3,180
RM-118 Stator stamping CRNO2.4 kg3%612
RM-130 Copper winding wire 22 SWG0.85 kg2%1,020
PT-044 Motor body castingAlt: PT-044B1 no1%940
SA-220 Pump end assemblyRev C1 no-1,410
PT-061 Impeller brass 7 vane1 no0.5%520
PT-072 Shaft EN8 16 mm1 no1%210
BO-015 Mechanical seal 16 mm1 no0%185
KT-005 Fasteners kit M81 set2%64
DWG-03Production PlannerSheet 4 of 8

Machines loaded, jobs tracked, vendors chased.

Work orders, machine and shift schedules, job cards on the shop floor and job-work sent to vendors.

  1. 1

    Machine and shift schedule

    Drag work orders across machines and shifts. Overloads show in amber before the week starts.

  2. 2

    Job cards on phones

    Operators start, pause and close jobs, and record good and rejected quantity with a reason, from any phone.

  3. 3

    Job-work and subcontracting

    Send material to vendors on a job-work challan, track what is with each vendor and receive back processed goods against it.

Open Production Planner
Detail
C

Production / Planner / Shift A + B

Machine schedule - Week 43

Machine
Mon 19Tue 20Wed 21Thu 22Fri 23Sat 24
Lathe 1
WO-5521 ShaftWO-5530
Lathe 2
WO-5522 Shaft EN8 x 160
VMC 01
WO-5518 VoluteSetup
Winding
WO-5524 Stator
Job-work
JW-212 Powder coat - Vendor
Assembly
WO-5531 SO-3318
Load 82%Lathe 2 at 104% on Tue14 job cards open
DWG-04Inventory LedgerSheet 5 of 8

Raw, WIP and finished, by store, batch and bin.

Raw material, work in progress and finished goods across every location, with reorder levels and batch trace from GRN to invoice.

  1. 1

    Stores, bins and locations

    Main store, RM store, WIP on the floor, FG bays and vendor locations, each with its own balance.

  2. 2

    Batch and serial tracking

    Trace a batch from supplier GRN through production to the customer invoice, or trace back from a complaint.

  3. 3

    Reorder levels

    Minimum, reorder and maximum levels per item and store. Items below reorder raise indents automatically.

Open Inventory Ledger
Detail
D

Inventory / Ledger / All stores

Stock ledger - Plant 1

Raw material

Rs 38.4 L

Work in progress

Rs 11.9 L

Finished goods

Rs 22.6 L

ItemStoreBatchBinQtyReorder
BO-015 Mechanical seal 16 mmMain storeB-0925R2-0440150
PT-044 Motor body castingMain storeH-1031Y-01180120
RM-130 Copper wire 22 SWGRM storeC-7720R1-11212180
PT-072 Shaft EN8 16 mmWIP - Lathe 2WO-5522Floor90100
FG-1001 Pump 1HPFG storeFG-2610Bay 36440
DWG-05AI Shortage PredictorSheet 6 of 8

Purchase that sees shortages coming.

Indents, purchase orders, goods receipts and bill matching. The AI looks across orders, BOMs, stock and supplier lead times to warn of shortages days ahead.

  1. 1

    Shortage date per part

    Projected stock is calculated day by day for every component. The first day it goes below zero is the shortage date.

  2. 2

    Order impact

    Each alert names the sales orders that will slip and by how many days, so the most urgent shortage is handled first.

  3. 3

    Three-way bill match

    Supplier bills are matched against PO and GRN for quantity, rate and tax. Mismatches are held for review.

Also on this sheet: Purchase Desk Open AI Shortage Predictor
Detail
F

Purchase / AI Shortage Predictor / Alerts

Forecast - BO-015 Mechanical seal

Runs short on 24 Oct. Delays SO-3318 by 6 days. Suggest 220 from Supplier B today (4 day lead time).

zero stock24 OctPO-784 arrives 20 Oct

Based on

  • 4 open sales orders - 610 pumps
  • BOM FG-1001 Rev C - 1 seal per pump
  • Stock 40 in Main store, 0 in transit
  • Supplier B lead time 4 days (last 9 POs)
DWG-06Finance BooksSheet 7 of 8

Profit on every order, GST on every invoice.

Accounts, GST returns, e-invoices, TDS, costing per product and profit per order. Export to Tally if your accountant needs it.

  1. 1

    GST returns

    GSTR-1 and GSTR-3B prepared from invoices and bills, with 2B reconciliation for input tax credit.

  2. 2

    Costing per product

    Material, labour, machine and overhead cost per product from actual consumption and job cards.

  3. 3

    Profit per order

    See the real margin on every sales order after material, labour, job-work and freight.

Open Finance Books
Detail
G

Finance / Costing / Order margin

Profit per order - SO-3318

Sales value24,51,200
Material (BOM actual)-15,62,400
Labour and machine hours-2,18,900
Job-work and freight-1,04,300
Overheads absorbed-1,36,000
Margin4,29,600 - 17.5%
GSTR-1 - SepFiled 11 Oct
GSTR-3B - SepReady to file
E-invoices - Oct86 IRNs generated
TDS 194Q - Q2Computed

How the AI and your data are handled

Suggestions, not decisions

Shortage predictions come with dates and reasons. Purchase and planning teams decide what to order.

Every input visible

Each prediction lists the orders, stock and lead times it used, so planners can check it.

Your filings, your review

Accounts and GST returns are prepared from your data. Your company and accountants remain responsible for filing.

Your data stays yours

Company data is encrypted, backed up daily and never sold.

Sheet 8 of 8

General notes

The questions plant owners and accountants ask before they switch.

Ask the team
  1. 01Can we move from Tally and Excel?

    Yes. Item masters, customers, suppliers, ledgers, opening balances, outstanding bills, BOMs and opening stock are imported from Tally and Excel. If your accountant wants to stay on Tally, Orrsap exports vouchers to it.

  2. 02Does it handle job-work and subcontracting?

    Yes. Material sent to vendors goes out on a job-work challan and stays in your stock as vendor stock until it returns. Processed goods are received against the challan, and ITC-04 data is ready.

  3. 03Does it support e-invoicing and e-way bills?

    Yes. IRN, QR code and e-way bill are generated from the sales invoice. You do not re-type anything on the government portal.

  4. 04Can shop-floor staff use it on phones?

    Yes. Job cards, material issue, stock counts, goods receipt and approvals are designed for phones, with QR scanning.

  5. 05Does the AI place orders?

    No. It suggests what to order, how much, from whom and by when. A person with purchase rights approves, edits or rejects every suggestion.

  6. 06How long does implementation take?

    A single plant usually goes live in 4 to 8 weeks, depending on how many BOMs and items you have and how clean the opening data is. Implementation is quoted after the demo.

Engineering change note - ECN-2026 - Your plant

Approved for production.

Change requested: move the plant from spreadsheets and separate books to one connected ERP. Here is the revision plan a single-plant rollout usually follows.

RevDescriptionWhen
AMasters, opening stock and ledgers imported from Tally and ExcelWeek 1-2
BSales orders, GST invoices and purchase running liveWeek 2-4
CBOMs released, work orders and job cards on the floorWeek 4-6
DShortage predictor switched on with real lead timesWeek 6-8

Requested by

Plant owner

Reviewed by

Orrsap team

Approved

For production

Book a demo with our team.

We run it on your products, your BOMs and your parts list.