Skip to content
Orrsap
DWG-03P-003Production Planner

Every machine, every shift, every job card.

Turn sales orders into work orders, load them on machines by shift and track each job card from the shop floor on a phone. Job-work sent to vendors is tracked like any other operation.

  1. 1

    Work orders from demand

    Create work orders from sales orders, reorder levels or a production plan. Material is reserved from the released BOM.

  2. 2

    Machine and shift schedule

    Drag work orders across machines and shifts. Overloads show in amber before the week starts.

  3. 3

    Job cards on phones

    Operators start, pause and close jobs, and record good and rejected quantity with a reason, from any phone.

Detail
C

Production / Planner / Shift A + B

Machine schedule - Week 43

Machine
Mon 19Tue 20Wed 21Thu 22Fri 23Sat 24
Lathe 1
WO-5521 ShaftWO-5530
Lathe 2
WO-5522 Shaft EN8 x 160
VMC 01
WO-5518 VoluteSetup
Winding
WO-5524 Stator
Job-work
JW-212 Powder coat - Vendor
Assembly
WO-5531 SO-3318
Load 82%Lathe 2 at 104% on Tue14 job cards open
  1. 4

    Job-work and subcontracting

    Send material to vendors on a job-work challan, track what is with each vendor and receive back processed goods against it.

  2. 5

    Material issue and returns

    Issue against the work order, return excess and record scrap, so WIP stock is always correct.

  3. 6

    Downtime and OEE

    Record breakdowns, setup and idle time per machine. Availability, performance and quality are calculated per shift.

Section A-A

From work order to finished goods

  1. 01

    Plan

    Work orders created from open demand.

  2. 02

    Schedule

    Loaded on machines by shift and priority.

  3. 03

    Issue

    Material issued from stores to the floor.

  4. 04

    Job cards

    Operators report output and rejects.

  5. 05

    Receive FG

    Finished goods enter stock with batch.

Specification

What is in Production Planner

PlanningMaterial requirement planning, capacity check, make-or-buy suggestions
SchedulingMachines, work centres, shifts, holidays, setup and cycle times
Shop floorMobile job cards, QR on job card, rejection reasons, rework orders
Job-workOutward and inward challans, vendor stock, ITC-04 data
QualityInspection at operation, at goods receipt and before dispatch
ReportsMachine load, WIP ageing, rejection analysis, OEE by machine

Notes

Common questions

  1. 01

    Does it handle job-work and subcontracting?

    Yes. Material sent to a vendor is tracked as vendor stock on a job-work challan. When it returns, the challan is closed against the received quantity and the ITC-04 data is ready.

  2. 02

    Can shop-floor staff use it on phones?

    Yes. Job cards, material issue and inspection screens are built for phones, with large buttons and QR scanning.

  3. 03

    What if a machine breaks down mid-week?

    Mark it down and Orrsap lists affected work orders and the next free machine that can run the same operation.

Engineering change note - ECN-2026 - Your plant

Approved for production.

Change requested: move the plant from spreadsheets and separate books to one connected ERP. Here is the revision plan a single-plant rollout usually follows.

RevDescriptionWhen
AMasters, opening stock and ledgers imported from Tally and ExcelWeek 1-2
BSales orders, GST invoices and purchase running liveWeek 2-4
CBOMs released, work orders and job cards on the floorWeek 4-6
DShortage predictor switched on with real lead timesWeek 6-8

Requested by

Plant owner

Reviewed by

Orrsap team

Approved

For production

Book a demo with our team.

We run it on your products, your BOMs and your parts list.