DWG-05AP-004.1AI Shortage Predictor

Know which part will run short, and when.

The predictor reads every open order, its BOM, current stock, open purchase orders and real supplier lead times. It tells purchase which part will run short, on which date, which order it delays, and what to order today.

  1. 1

    Shortage date per part

    Projected stock is calculated day by day for every component. The first day it goes below zero is the shortage date.

  2. 2

    Order impact

    Each alert names the sales orders that will slip and by how many days, so the most urgent shortage is handled first.

  3. 3

    Suggested purchase

    A quantity and a supplier are suggested from lead time history, rate and delivery record. Purchase can change either.

Detail
F

Purchase / AI Shortage Predictor / Alerts

Forecast - BO-015 Mechanical seal

Runs short on 24 Oct. Delays SO-3318 by 6 days. Suggest 220 from Supplier B today (4 day lead time).

zero stock24 OctPO-784 arrives 20 Oct

Based on

  • 4 open sales orders - 610 pumps
  • BOM FG-1001 Rev C - 1 seal per pump
  • Stock 40 in Main store, 0 in transit
  • Supplier B lead time 4 days (last 9 POs)
  1. 4

    Reasons you can check

    Every alert lists the orders, BOM revision, stock and lead times it used. Planners can open each one.

  2. 5

    Real lead times

    Lead time is learnt from actual PO to GRN dates per supplier and item, not from the number on the supplier form.

  3. 6

    People approve, always

    The predictor never places an order. A suggestion becomes a PO only when someone with purchase rights approves it.

Section A-A

How a prediction is made

  1. 01

    Read demand

    Open sales orders and production plan.

  2. 02

    Explode BOMs

    Released revision, scrap allowance included.

  3. 03

    Net supply

    Stock, open POs, WIP and vendor stock.

  4. 04

    Apply lead times

    Learnt from each supplier history.

  5. 05

    Alert and suggest

    Date, impact, reason and suggested PO.

Specification

What is in AI Shortage Predictor

InputsSales orders, production plan, released BOMs, stock by store, open POs, WIP, vendor stock
Lead time modelActual PO to GRN days per supplier and item, with delay trend
HorizonDay by day projection for the next 60 days
RefreshRecalculated whenever an order, stock movement or PO changes
OutputShortage date, quantity short, affected orders, delay in days, suggested PO
ControlSuggestions only. Purchase orders need human approval

Notes

Common questions

  1. 01

    Does the AI place orders?

    No. It suggests a quantity, supplier and date. A person in purchase or planning reviews it and approves, edits or rejects it.

  2. 02

    How do we know a prediction is right?

    Each alert shows the data behind it: the orders, BOM, stock and lead times used. If any input is wrong, fixing it updates the prediction.

  3. 03

    How much history does it need?

    It works from day one with the lead times you enter. As POs and GRNs are recorded, it switches to actual supplier lead times.

Engineering change note - ECN-2026 - Your plant

Approved for production.

Change requested: move the plant from spreadsheets and separate books to one connected ERP. Here is the revision plan a single-plant rollout usually follows.

RevDescriptionWhen
AMasters, opening stock and ledgers imported from Tally and ExcelWeek 1-2
BSales orders, GST invoices and purchase running liveWeek 2-4
CBOMs released, work orders and job cards on the floorWeek 4-6
DShortage predictor switched on with real lead timesWeek 6-8

Requested by

Plant owner

Reviewed by

Orrsap team

Approved

For production

Book a demo with our team.

We run it on your products, your BOMs and your parts list.